首页> 外文期刊>Inside FERC >‘Changed circumstances’ prompt change to Cal-ISO 2011 Southwest blackout settlement
【24h】

‘Changed circumstances’ prompt change to Cal-ISO 2011 Southwest blackout settlement

机译:“改变环境”及时改为Cal-Iso 2011 Southwest Blackout Sollement

获取原文
获取原文并翻译 | 示例
       

摘要

California Independent System Operator will not have to implementcontingency modeling enhancements prescribed by a 2014 settlementto resolve alleged reliability violations that occurred during the 2011Pacific Southwest Blackout, the Federal Energy RegulatoryCommission said in an order approving the grid operator’s request.The grid operator argued in a Sept. 17 motion to FERC that thecircumstances that drove the need for a contingency modelingenhancement (CME) project no longer exist, and that the costs ofimplementing the project greatly outweighed any potential benefits.
机译:加利福尼亚独立系统运营商不必实施2014年结算规定的应急建模增强功能解决2011年期间发生的涉嫌可靠性违规行为太平洋西南停电,联邦能源调节委员会在批准网格运营商请求的订单中表示。网格运营商在9月17日辩论到Ferc那个推动需要应急建模的情况增强(CME)项目不再存在,并且成本实施项目大大超过了任何潜在利益。

著录项

  • 来源
    《Inside FERC》 |2021年第8期|5-6|共2页
  • 作者

    Jasmin Melvin;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号