首页> 外文期刊>Innovative Infrastructure Solutions >Exploring the criteria influencing construction productivity of diaphragm walls in underground stations in Egypt
【24h】

Exploring the criteria influencing construction productivity of diaphragm walls in underground stations in Egypt

机译:探索埃及地下站膜墙施工生产率的标准

获取原文
获取原文并翻译 | 示例
           

摘要

Planning and cost estimation engineers face great challenges to estimate construction productivity rate (PR) of diaphragm walls (DWs). A specific guideline to predict the construction of DWs in underground station is still not available. In order to overcome these challenges, the criteria affecting PR for the construction of DWs should be hence defined and the factors that impact the construction productivity of DWs should be well understood. Briefly and given the limitations of previous research work, we gathered and compiled a comprehensive key list of all criteria based on previous reports. This comprehensive key list was later reviewed by underground construction and specialized experts to define, identify and distinguish the most important criterion affecting the construction productivity of DWs in Egypt. We developed two questionnaire surveys to conduct these interviews with the experts. This obtained criterion was ranked and weighted using Simos' procedure based on prioritizing the influencing criteria. Our findings concluded that the ground condition type/and characteristics, soil-machine interaction, machine type and model characteristics (grab/or cutter), breakdowns and de-sender efficiency are significantly influencing the excavation rate. Additionally, factors such as cage type (fiber/or steel), connection type (welding/or mechanical) and volume of steel fixing crew are crucial to identify the rate of installation cages. On the other side, the arrival time of concrete car mixer and panel volume were determined to significantly impact the concrete casting rate. In summary, this study presented a distinctive weighting and ranking methodology of the influencing criteria for the PR of DWs. Furthermore, this work provides an initial concept for many full-scale prediction applications to estimate an accurate construction productivity of DWs, particularly in the underground projects.
机译:规划和成本估算工程师面临巨大的挑战,以估算隔膜墙(DWS)的施工生产率(PR)。预测地铁站DWS建设的具体指南仍然不可用。为了克服这些挑战,影响了影响DWS的PR的标准应理解,应当很好地理解影响DWS施工效率的因素。简要介绍了先前研究工作的局限性,我们收集并编译了基于以前的报告的全部标准的全面关键清单。此综合键列表后来被地下建设和专门专家审查,以定义,识别和区分影响埃及DWS施工效率的最重要标准。我们开发了两个调查问卷调查,以与专家进行这些访谈。使用SIMOS的程序基于优先考虑影响标准来排序和加权该标准。我们的研究结果得出结论,地面条件类型/和特性,土壤机相互作用,机器类型和模型特性(抓取/或刀具),故障和解发器效率显着影响了挖掘率。此外,轿厢类型(纤维/或钢),连接型(焊接/或机械)和钢固定机组体积等因素至关重要,以确定安装笼的速率。另一方面,确定混凝土汽车混合器和面板体积的到达时间显着影响了混凝土铸造速率。总之,本研究介绍了DWS PR的影响标准的独特加权和排名方法。此外,这项工作为许多全规模预测应用提供了初始概念,以估计DWS的准确施工生产率,特别是在地下项目中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号