首页> 外文期刊>Industry week >Box-Swap Process Helps GM-Fort Wayne Keep on Truckin'
【24h】

Box-Swap Process Helps GM-Fort Wayne Keep on Truckin'

机译:盒子交换过程帮助通用汽车公司韦恩堡继续使用卡车

获取原文
获取原文并翻译 | 示例
           

摘要

Shortly after General Motors emerged from bankruptcy reorganization in summer 2009, employees at GM's Fort Wayne (Ind.) Assembly Plant not only learned that the plant would be staying open, but also that they'd be getting more work—and soon.As part of its restructuring, GM had decided to shutter its truck and bus assembly plant in Pontiac, Mich., and move production of heavy-duty pickup trucks from Pontiac to Fort Wayne. In September 2009, GM announced that it was adding a third shift to GM-Fort Wayne, and in early 2010 the plant beefed up for the extra shift by bringing in 900 employees from 35 GM sites in 25 states.
机译:通用汽车公司于2009年夏季从破产重组中撤出后不久,通用汽车公司在福特韦恩堡(印第安纳州)装配厂的员工不仅得知该厂将继续营业,而且还将很快获得更多工作。在进行重组时,通用汽车决定关闭其在密歇根州庞蒂亚克的卡车和客车组装厂,并将重型皮卡的生产从庞蒂亚克转移到韦恩堡。通用汽车在2009年9月宣布,它将对通用汽车韦恩堡进行第三次轮班。2010年初,该工厂从25个州的35个通用汽车基地引进了900名员工,为进一步的转变做好了准备。

著录项

  • 来源
    《Industry week》 |2012年第2期|p.35|共1页
  • 作者

    JOSH CABLE;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号