Power engineering effective solution triangle customer-consultant-manufacturer: a case history on meeting energy let-through requirements for a distribution transformer

机译:电力工程有效解决方案三角客户-顾问-制造商:满足配电变压器能量通过要求的案例历史

获取原文
获取原文并翻译 | 示例
           

摘要

Maximizing the reliability of a medium-voltage energy-delivery system requires an extensive amount of distribution engineering knowledge. When that system is to have the added flexibility of having its standby generators operate while tied into the utility grid, the depth of the knowledge needed increases significantly. In many cases, it would require more knowledge than many experienced consulting firms might possess. The standby generator project case history discussed in this paper involved a lesser known but very important code compliance issue. That issue became important when less-flammable oil-filled pad-mounted transformers were selected to provide an isolating link between those generators and the utility distribution system serving a commercial facility. The isolating link was intended to protect those generators from damage should they suffer ground faults. This paper is intended to point out two important facts. First, to provide an explanation and background of what is a lesser known, yet critically important, issue-specifically, the requirement that "maximum i/sup 2/t let-through limits" for less-flammable transformers comply with NEC Listing requirements. Secondly, the paper points out how the broad network of talented engineers within the Industrial and Commercial Power Systems (I&CPS) Department of the IEEE Industry Applications Society was able to help the project's design engineer to both understand this issue and to assist in obtaining the equipment needed to successfully complete the project.
机译:使中压能量输送系统的可靠性最大化需要大量的配电工程知识。当该系统要具有更大的灵活性,即使其备用发电机在连接到公用电网的同时运行时,所需知识的深度将大大增加。在许多情况下,这将需要比许多经验丰富的咨询公司可能拥有的知识更多的知识。本文讨论的备用发电机项目案例历史涉及一个鲜为人知但非常重要的代码合规性问题。当选择不易燃的填充油的垫装式变压器来提供这些发电机与为商业设施服务的公用事业配电系统之间提供隔离连接时,该问题就变得很重要。隔离链路旨在保护那些遭受接地故障的发电机,使其免受损坏。本文旨在指出两个重要事实。首先,要提供关于什么是鲜为人知但至关重要的问题的解释和背景,具体而言,对于易燃变压器的“最大i / sup 2 / t直通限制”要求符合NEC上市要求。其次,论文指出了IEEE工业应用协会的工业和商用电源系统(I&CPS)部门内的才华横溢的工程师网络如何能够帮助项目的设计工程师理解这一问题并帮助获得设备。需要成功完成项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号