首页> 外文期刊>Industry Applications, IEEE Transactions on >Cement Industry Readiness Check for Upgraded Environmental Regulations: Final Actions to Implement the Latest MACT, NSPS, and Alternative Fuel Requirements
【24h】

Cement Industry Readiness Check for Upgraded Environmental Regulations: Final Actions to Implement the Latest MACT, NSPS, and Alternative Fuel Requirements

机译:水泥行业准备情况检查,以获取升级的环境法规:实施最新的MACT,NSPS和替代燃料要求的最终行动

获取原文
获取原文并翻译 | 示例
           

摘要

As the rulemaking compliance dates come further into effect in 2015, U.S. cement plants will take final actions to upgrade compliance programs for the National Emission Standards for Portland Cement Manufacturing [also known as the Portland Cement Maximum Achievable Control Technology (PC MACT)]. For those facilities using alternative fuels and possibly raw materials, past practices will also require altering to address the non-hazardous secondary material (NHSM) and Commercial and Industrial Solid Waste Incineration (CISWI) rules. Meanwhile, there is continued work by the industry and the U.S. Environmental Protection Agency (EPA) to decipher and clarify final implementation steps of each rule and, in particular, to address the question of “what is a waste,” which drives facility implementation strategies. The Portland cement industry has a long and proven track record in historically implementing the PC MACT rules and in using alternative fuels and raw materials (AFR) for a variety of environmentally and economically beneficial reasons. As the final compliance steps are put in place, there are continuing questions on how the new rules will be successfully implemented, while optimizing plant operations and continuing to grow the important AFR programs. Given that this suite of regulations will forever change the playing field on day-to-day operations, and the historic use of AFR in cement plants in the U.S., there will be critical compliance and financial risk implications on how to best manage final decisions. This paper reviews final approaches for cement plant operators to maximize opportunities and reduce unintentional risks posed by the new rules, by exploring the lessons learned on implementing PC MACT, CISWI, and NHSM rules based on the authors' work with the Portland Cement Association, individual facilities, and general industry/EPA discussions.
机译:随着法规制定合规日期在2015年进一步生效,美国水泥厂将采取最终行动,升级《波特兰水泥制造国家排放标准》(也称为波特兰水泥最大可实现控制技术(PC MACT))的合规计划。对于那些使用替代燃料和可能使用原材料的设施,过去的实践也将需要进行修改,以解决无害二次材料(NHSM)和商业和工业固体废物焚化(CISWI)的规定。同时,行业和美国环境保护署(EPA)仍在继续工作,以破译和阐明每条规则的最终实施步骤,尤其是解决“什么是浪费”的问题,该问题推动了设施实施策略的发展。 。在历史上执行PC MACT规则以及出于各种对环境和经济有益的原因而使用替代燃料和原材料(AFR)的过程中,波特兰水泥行业有着悠久的实践记录。随着最终合规步骤的到位,在如何优化工厂运营并继续发展重要的AFR计划的同时,仍存在关于如何成功实施新规则的持续疑问。鉴于这套法规将永远改变日常运营的竞争环境,以及美国水泥厂对AFR的历史性使用,因此如何最好地管理最终决策将面临关键的合规性和财务风险。本文根据作者与波特兰水泥协会的工作经验,总结了有关实施PC MACT,CISWI和NHSM规则的经验教训,从而回顾了水泥厂运营商最大程度地利用机会并减少新规则带来的意外风险的最终方法。设施,以及一般行业/ EPA讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号