The Zonal Railway has been working on installation of Solar Power Plants at its facilities like Stations, Divisional Offices and Office of GM/NCR situated in Sube-darganj in Allahabad. Under the Guidance of GM/NCR Shri M.C. Chauhan, Solar Power Plants with an installed capacity of 4.92 MW have been installed in NCR till 31 December, 2017. Of these 3.80 MW have been installed under a new sanction of 10MW. Thus in the new year, the Zonal Railway is all set to take this figure up to 11.12 MW. In terms of saving of CO_2 emissions and carbon credits, an installed capacity of 11.12MW translates into annual carbon credits of 8646.912 tonnes. That the savings are annual and recurring in nature, augurs well for the environment as the environmental benefits will add up year after year for generations to come.
机译:地带铁路公司一直在其设施中安装太阳能发电厂,这些设施包括位于阿拉哈巴德Sube-darganj的车站,分区办公室和GM / NCR办公室。在GM / NCR的指导下,Shri M.C.截至2017年12月31日,乔恩汉州太阳能装机厂的装机容量为4.92兆瓦,其中3.80兆瓦的装机容量为10兆瓦。因此,在新的一年中,地带铁路都将使这一数字达到11.12兆瓦。就节省CO_2排放和碳信用额而言,装机容量为11.12MW意味着每年的碳信用额为8646.912吨。节约是年度性的,并且是自然而然的,对于环境而言,这是个好兆头,因为环境效益将年复一年地累积到子孙后代。

著录项

  • 来源
    《Indian Railways》 |2018年第11期|44-44|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号