...
首页> 外文期刊>Indian Railways >Foundation Stone of LHB Coach Refurbishing Facility Laid at Bongaigaon
【24h】

Foundation Stone of LHB Coach Refurbishing Facility Laid at Bongaigaon

机译:LHB Coach翻新设施的基石铺设在Bongaigaon

获取原文
获取原文并翻译 | 示例
           

摘要

Minister of State of Railways (the then) Shri Rajen Gohain laid the foundation stone of a refurbishing facility of LHB coaches at New Bongaigaon on 18 February, 2019. Shri Sanjive Roy, General Manager, N F Railway, Shri Ravilesh Kumar, Divisional Railway Manager of Rangiya Division alongwith other senior railway officials were present on the occasion. The proposed shop will have the capacity to refurbish about 120 LHB coaches every year. It will have about 15,000 square metre of shaded area housing 4 cranes of capacity 50 Metric tonnes & 10 Metric tonnes and other machineries and tools for maintenance of the LHB coaches.
机译:铁路部长(当时)Shri Rajen Gohain将于2019年2月18日在新Bongaigaon奠定了LHB教练的翻新设施的基石.Shi Sanjive Roy,NF铁路,Shri Ravilesh Kumar,Shri Ravilesh Kumar,Shri Ravilesh Kumar其他高级铁路官员的Rangiya部门是在场的场合。拟议的商店每年都会有大约120 LHB教练翻新。它将拥有大约15,000平方米的阴影区域,容量50公吨和10公吨等机械和用于维护LHB教练的机械和工具。

著录项

  • 来源
    《Indian Railways》 |2019年第3期|24-24|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号