...
首页> 外文期刊>Indian journal of power and river valley development >Nathpa-Jhakri H.E. Project works executed by Jaiprakash Hyundai Consortium for fabrication and erection of the pressure shaft steel liners
【24h】

Nathpa-Jhakri H.E. Project works executed by Jaiprakash Hyundai Consortium for fabrication and erection of the pressure shaft steel liners

机译:纳斯帕·贾克里(Nathpa-Jhakri) Jaiprakash Hyundai财团执行的项目工作,即压力轴钢衬套的制造和安装

获取原文
获取原文并翻译 | 示例
           

摘要

Contract No. 3 was awarded to Jaiprakash-Hyundai Consortium (Jaiprakash Associates Limited as leader and HYUNDAI Engineering & Construction Company Ltd., Korea as Consortium Partner) in July 1993, which included, besides civil works relating to pressure shafts, underground powerhouse complex, tailrace tunnel, etc., the fabrication, transportation, erection and testing of steel liners for pressure shafts.
机译:1993年7月,Jaiprakash-Hyundai财团(Jaiprakash Associates Limited担任组长,韩国HYUNDAI Engineering&Construction Company Ltd.作为财团的合伙人)被授予第3号合同,其中包括与压力井有关的土木工程,地下厂房,尾矿隧道等,压力轴用钢衬的制造,运输,安装和测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号