Monitoring of the environmental action plan during the construction of Bhairab Bridge over the Meghna River

机译:监测梅格纳河上的Bhairab大桥期间的环境行动计划

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A study was carried out with the objectives to assess the existing environmental conditions to establish baseline conditions of the Bhairab Bridge project and to monitor the environmental action plan implemented during the construction of the Bhairab Bridge project. The bridge was constructed on the Dhaka-Sylhet National Highway in Bangladesh over the Meghna river at a distance of 110 m upstream of the existing Bhairab railway bridge. The project consists of three main components such as a bridge with the length of 1.23 km, river training works with the length of 1.07 km and bridge connecting approach roads with the length of 1.43 km. The study was carried on the basis of available secondary and field monitoring data. The secondary data pertaining to this study were collected from different sources. Field data on water (surface, ground and drinking) quality and quality of dredged materials were collected from the various monitoring points in the project area during the construction stage of the bridge. Data on vibration impact on the existing Bhairab railway bridge due to pile driving activities were also collected from the site. The results of the analyses of the available data showed the parameters that were tested from the collected surface water samples of the monitoring points in the project area revealed that all the water bodies except the Meghna river were polluted due to untreated waste, toilet and public ignorance but not due to project activities. Groundwater quality test results showed the presence of arsenic (As) which was not due to project activities. Drinking water from the hand tube wells contained high level of arsenic (As) and therefore deep tube wells were installed at the depth of 200 m to supply pure drinking water. The test results of the water samples showed that all the parameters were within the standard values and suitable for drinking. Most of the parameters of the quality of dredged materials were within the acceptable limit and hence used for fill materials of the project area. The vibration level on railway bridge prior to pile driving of the road bridge did not exceed the base value. It showed that no vibration impacts were occurred on the railway bridge due to pile driving of the newly constructed Bhairab road bridge. Th monitoring on air and noise pollutions, navigation, drainage and waste management was carried out regularly to avoid any environmental damage. About 3000 trees have been planted in the project area to compensate 35 trees lost which would also enhance the positive environmental impacts in the project area. It can therefore be concluded that the Bhairab bridge project constructed over the Meghna river is environmentally friendly and sustainable.
机译:进行了一项研究,其目的是评估现有的环境条件,以建立Bhairab桥项目的基准条件,并监视在Bhairab桥项目的施工期间实施的环境行动计划。这座桥梁建在孟加拉国达卡-希尔泰特国家高速公路上,位于梅格纳河上,距现有Bhairab铁路桥上游110 m。该项目由三个主要组成部分组成:一座长1.23 km的桥梁,一座长1.07 km的河道整治工程和一座长1.43 km的桥梁连接引道。该研究是在可获得的二级和现场监测数据的基础上进行的。与这项研究有关的次要数据来自不同的来源。在桥梁施工阶段,从项目区域的各个监测点收集了有关水(地表,地面和饮用水)质量和疏materials材料质量的现场数据。还从现场收集了由于打桩活动对现有的Bhairab铁路桥梁的振动影响的数据。对现有数据的分析结果表明,从项目区域监测点收集的地表水样本中测试的参数表明,除梅格纳河外,所有水体均由于未经处理的废物,厕所和公众无知而受到污染但不是由于项目活动。地下水水质测试结果表明,砷的存在不是由于项目活动造成的。手动管井中的饮用水中砷含量很高,因此在200 m的深度处安装了深管井以提供纯净的饮用水。水样的测试结果表明,所有参数均在标准值范围内,适合饮用。疏materials材料质量的大多数参数都在可接受的范围内,因此可用于项目区域的填充材料。公路桥梁打桩之前铁路桥梁的振动水平未超过基本值。结果表明,新建的Bhairab公路桥梁打桩不会对铁路桥梁产生振动影响。定期进行空气和噪音污染,航行,排水和废物管理的监测,以避免任何环境破坏。项目区域已种植约3000棵树木,以补偿35棵树木的损失,这也将增强项目区域对环境的积极影响。因此可以得出结论,在梅格纳河上建造的Bhairab桥项目是环境友好和可持续的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号