首页> 外文期刊>The Indian concrete journal >Cyclic behaviour of precast RC connections
【24h】

Cyclic behaviour of precast RC connections

机译:预制RC连接的循环行为

获取原文
获取原文并翻译 | 示例
       

摘要

Earthquake damages of precast structures can be attributed to poor connections between precast elements and also between precast elements and lateral load-resisting system. In this context, four experiments were performed on precast and corresponding monolithic exterior beam-column joint sub-assemblage specimens. The schemes for the anchorage of beam bars were different in the two sets of specimens. Further, in precast specimens, the connectivity of reinforcement bars between beam and column was achieved by welding the exposed bars of the components in the joint region. Under displacement-controlled pseudo-static loading, the precast specimen with beam bars anchored into the column performed better than the precast specimen with continuous U-bars as beam reinforcement; this performance of the former was comparable to that of the corresponding monolithic specimen.
机译:预制结构的地震破坏可归因于预制构件之间以及预制构件与抗侧向荷载系统之间的连接不良。在这种情况下,对预制和相应的整体式外部梁柱联合节点子标本进行了四个实验。两组试样中,梁杆的锚固方案不同。此外,在预制试样中,梁和柱之间的钢筋连接是通过焊接接头区域中裸露的钢筋来实现的。在位移控制的拟静力荷载下,梁杆锚固在柱中的预制试样的性能优于连续U型杆作为梁增强的预制试样。前者的性能可与相应的整体样品相媲美。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号