首页> 外文期刊>The Indian concrete journal >DMRC will use latest international technology in third phase
【24h】

DMRC will use latest international technology in third phase

机译:DMRC将在第三阶段使用最新的国际技术

获取原文
获取原文并翻译 | 示例
       

摘要

The Delhi Metro Rail Corporation (DMRC) will use the latest international technology in the third phase to save time and trouble during construction. Said a DMRC spokesperson , "We will be using 25-metre-long girders on some of the elevated viaducts in phase III." These girders are considerably longer than those used in phase II, which were four to six metres long and took more time during construction. Added the spokesperson, "These girders are precast in the casting yards, brought to the site on trailers, and launched with the help of cranes which take less time than the conventional segmental launching technique involving the use of launching girders."
机译:德里地铁公司(DMRC)将在第三阶段使用最新的国际技术,以节省施工过程中的时间和麻烦。 DMRC发言人说:“我们将在第三阶段的一些高架桥上使用25米长的大梁。”这些梁比第二阶段使用的梁更长,后者长四到六米,在建造过程中花费了更多时间。发言人补充说:“这些大梁是在浇铸场中预制的,用拖车带到现场,并借助起重机来进行发射,这比使用分段发射梁的传统分段发射技术要少。”

著录项

  • 来源
    《The Indian concrete journal》 |2011年第6期|p.7|共1页
  • 作者

    Er. Ish Jain;

  • 作者单位

    Organising Secretary Indian Concrete Institute - Nagpur Centre 24, "Abhang", Central Excise Colony,Ring Road, Near Chatrapati Nagar Square,Nagpur 440015;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:24:18

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号