'Kilpailu- ja kuluttajavirasto' Decision of the European Court of Justice (Second Chamber) 14 January 2020 - Case No. C-450/19; ECLI:EU:C:2021:10

机译:欧洲司法法院的“竞争和消费者代理”决定(第二届会议厅)14月14日2020年 - 案例编号C-450/19; ECLI:欧盟:C:2021:10

获取原文
获取原文并翻译 | 示例

摘要

1. Article 101(1) TFEU must be interpreted as meaning that, where an undertaking which has allegedly participated in a single and continuous infringement of that provision, the most recent constituent element of which consists in the concerted submission with its competitors of a tender for the award of a public works contract, has won the contract and concluded with the contracting authority a works contract determining the essential characteristics of that contract and, in particular, the overall price to be paid for those works, the performance and payment of the price for which are staggered over time, the infringement period corresponds to the period up to the date of signature of the contract concluded between the undertaking and the contracting authority on the basis of the concerted bid submitted by that undertaking. It is for the national court to ascertain the date on which the essential characteristics of the relevant contract and, in particular, the total price to be paid for the work, have been definitively determined.
机译:1.第101条(1)第101条(1)TFEU必须被解释为据称,据称参与该条款的单一和持续侵犯的承诺,其中最新的组成部分由其竞争对手的竞争对手组成对于奖励公共工程合同,赢得了合同并缔结了合同,缔约国签订了一项劳动合同,确定该合同的基本特征,特别是对这些作品的总价,绩效和支付随着时间的推移,侵权期的价格是交错的,侵权期对应于在该事业提交的协同投标的基础上签订合同与合同之间签署的时期。它是国家法院确定相关合同的基本特征的日期,特别确定了该工作所支付的总价格。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号