...
首页> 外文期刊>IEICE Transactions on fundamentals of electronics, communications & computer sciences >Replacement and Preventive Maintenance Models with Random Working Times
【24h】

Replacement and Preventive Maintenance Models with Random Working Times

机译:工作时间随机的更换和预防性维护模型

获取原文
获取原文并翻译 | 示例

摘要

This paper considers replacement and maintenance policies for an operating unit which works at random times for jobs. The unit undergoes minimal repairs at failures and is replaced at a planned time T or at a number N of working times, whichever occurs first. The expected cost rate is obtained, and an optimal policy which minimizes it is derived analytically. The imperfect preventive maintenance (PM) model, where the unit is improved by PM after the completion of each working time, is analyzed. Furthermore, when the work of a job incurs some damage to the unit, the replacement model with number N is proposed. The expected cost rate is obtained by using theory of cumulative processes. Two modified models, where the unit is replaced at number N or at the first completion of the working time over time T, and it is replaced at T or number N, whichever occurs last, are also proposed. Finally, when the unit is replaced at time T, number N or Kth failure, whichever occurs first, the expected cost rate is also obtained.
机译:本文考虑了随机运行的作业单元的更换和维护策略。发生故障时,该设备将进行最少的维修,并在计划的时间T或工作时间N(以先到者为准)进行更换。获得预期的成本率,并通过分析得出将其最小化的最佳策略。分析了不完善的预防性维护(PM)模型,该模型在每个工作时间完成后通过PM对其进行改进。此外,当工作对单元造成损坏时,提出了编号为N的替换模型。预期成本率是通过使用累积过程理论获得的。还提出了两种改进的模型,其中,在时间N上或在工作时间上首次完成时更换设备,然后在T或N上更换设备,以最后发生的时间为准。最后,当在时间T,故障次数N或第K个发生故障时(以较早者为准)更换该设备时,还将获得预期的成本率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号