The restrictions of transportation are one of the major parameters for transformer design and affect the available capacity, various characteristics and even reliability. With the progress of increasing power demand, transformer size and weight have been increasing. However, in Japan the restrictions for size and weight in rail and road are strict, and several kinds of technology for transformer construction and transportation method have been developed to meet these requirements.rnOne technology is the disassembled transportation method for transformer. Fortunately we have experienced three type disassembled transportation methods for Kamishiiba power station for approximately 50 years. This paper introduces a history on improvement of disassembled transportation technology and development of large power transformer.%明治26年(1893年)にわが国で初めて変圧器が製作さrnれ,明治36年(1903年)には国産第1号が製作された。既rnにわが国の変圧器の歴史は100年以上が経過しているが,rn飛躍的に大容量化が進んだのは,系統電圧が220~275kVrnの超高圧系統が運用された昭和26年(1951年)以降であrnり,その後500kV系統が昭和47年(1972年)に完成し,rn現在の電力網の整備と共に変圧器は歩んできた。
机译:运输限制是变压器设计的主要参数之一,并且会影响可用容量,各种特性甚至可靠性。随着功率需求的增加,变压器的尺寸和重量也不断增加。然而,在日本,对铁路和公路的尺寸和重量的限制是严格的,并且已经开发出了多种用于变压器构造和运输方法的技术来满足这些要求。一种技术是变压器的分解运输方法。幸运的是,我们在Kamishiiba电站经历了三种类型的拆卸运输方法,已有大约50年的历史。本文介绍了拆卸运输技术的改进和大型电力变压器发展的历史。%明治26年(1893年)にわが国で初めて変圧器が制作さrnれ,明治36年(1903年)には国产第1号にわが制作された。既rnにわが国の変圧器の歴史は100年以上が経过しているが,rn飞跃的に大容量化が进んだのは,系统电圧が220〜275kVrnの超高圧系统が运用された昭和26年(1951年)以降であrnり,その后500kV系统が昭和47年(1972年)に完成し,rn现在の电力网の整备と共に変圧器は歩んできた。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号