...
首页> 外文期刊>Power and Energy Magazine, IEEE >Refurbishments in Australasia: Upgrades of HVdc in New Zealand and FACTS in Australia
【24h】

Refurbishments in Australasia: Upgrades of HVdc in New Zealand and FACTS in Australia

机译:大洋洲的翻新工程:新西兰HVdc的升级和澳大利亚的FACTS

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The equipment and infrastructure of the electric power system is designed to have a lifetime of 20?40 years or more depending on operating conditions and environment. This is due to the desire for optimal reliability and the large initial investment for the equipment itself. At some point, the primary and secondary equipment will need to be replaced or refurbished. Different electrical system installations have different needs in terms of refurbishment. The projects that will be discussed are high-voltage dc (HVdc) and flexible ac transmission systems (FACTSs) that Siemens has refurbished recently in Australasia. In particular, the HVdc project is located in New Zealand, and the FACTS installations are in Australia.
机译:电力系统的设备和基础设施的使用寿命视运行条件和环境而定,为20至40年或更长。这是由于对最佳可靠性的渴望以及对设备本身的大量初始投资。在某些时候,主要和次要设备将需要更换或翻新。在翻新方面,不同的电气系统安装有不同的需求。即将讨论的项目是西门子最近在大洋洲翻新的高压直流(HVdc)和柔性交流输电系统(FACTS)。特别是,HVdc项目位于新西兰,FACTS装置位于澳大利亚。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号