...
首页> 外文期刊>IEEE Power & Energy Magazine >Postmortem analysis of power grid blackouts - The role of measurement systems
【24h】

Postmortem analysis of power grid blackouts - The role of measurement systems

机译:电网停电的事后分析-测量系统的作用

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Promptly following any blackout, an investigation is conducted to determine the who, what, where, when, why, and how. At the heart of the postmortem investigation is the detailed sequence of events. The sequence of events is based on vast amounts of data collected from multiple points in the system from myriad data collection instruments, some devoted to the purpose of supporting system disturbance postmortem analysis, others providing useful additional context or filling in missing gaps. The more that the investigators know about their available sources of data, and the inherent limitations of each, the better (and quicker) will be the analysis. This is especially important when a large blackout has occurred, wherein there is pressure to find answers quickly, but because of the size and complexity of the event, a deliberate and methodical investigation is necessary. This paper discusses the role that system monitoring plays in supporting the investigation of large-scale system disruptions and blackouts
机译:停电后,将立即进行调查以确定谁,什么,在哪里,何时,为什么以及如何。事后调查的核心是事件的详细顺序。事件的顺序基于从众多数据收集工具从系统中多个点收集的大量数据,其中一些专门用于支持系统扰动事后分析的目的,其他则提供有用的附加上下文或填补缺失的空白。研究人员对可用数据来源了解得越多,每种方法固有的局限性,分析就会越好(越快)。当发生大规模停电时,这一点尤其重要,在这种情况下,有迅速找到答案的压力,但是由于事件的规模和复杂性,有必要进行有计划的,系统的调查。本文讨论了系统监控在支持大规模系统中断和停电调查中所扮演的角色

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号