首页> 外文期刊>Engineering Management Review, IEEE >Accounting for project management activities
【24h】

Accounting for project management activities

机译:项目管理活动的会计

获取原文
获取原文并翻译 | 示例
           

摘要

Defining the scope of a project clearly for the project manager, the team and other key stakeholders can require the use of multiple tools. The initial definition, which is high level, occurs in the Project Charter. The Charter mentions the product of the project and many of the management criteria such as the finish date, milestones with dates, budget, possibly risks, etc. As the planning progresses, the details of the project are fleshed out in the Scope Description. This is usually narrative, descriptive, and detailed. It addresses the product of the project, and also discusses how this will be achieved. Project Management functions must be included. To give us something more structured which can be used for determining some of the project parameters, the scope is then broken down into components in the Work Breakdown Structure (WBS).
机译:为项目经理,团队和其他主要利益相关者明确定义项目范围可能需要使用多种工具。最初的定义是高层次的,出现在项目章程中。 《宪章》提到了项目的产品和许多管理标准,例如完成日期,具有里程碑意义的日期,预算,可能的风险等。随着计划的进行,项目的详细信息在“范围说明”中得到充实。这通常是叙述性,描述性和详细性的。它讨论了项目的产品,并讨论了如何实现。必须包括项目管理功能。为了给我们提供一些可以用来确定某些项目参数的结构化内容,然后将范围分解为工作分解结构(WBS)中的组件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号