首页> 外文期刊>Hydrotechnical Construction >Resolution of the all-Russian conference 'problems of modernizing and prolonging the life of turbine equipment,' ST. Petersburg, June 10-11, 1999
【24h】

Resolution of the all-Russian conference 'problems of modernizing and prolonging the life of turbine equipment,' ST. Petersburg, June 10-11, 1999

机译:全俄会议决议“现代化和延长涡轮设备寿命的问题”,ST。圣彼得堡,1999年6月10日至11日

获取原文
获取原文并翻译 | 示例
       

摘要

The conference notes that in recent years the problem of wear and obsolescence of equipment of electric power stations and networks has steadily become exacerbated in Russia's power industry. The capacities of thermal and hydroelectric power station equipment that has exhausted its life are increasing. According to the available predictive evaluation, for the existing rate of renovation and established approaches to the use of installed capacity, 49/100, or 84 million kWh, of generating equipment will have exhausted its life by the year 2005.
机译:会议注意到,近年来,在俄罗斯的电力工业中,发电厂和电网设备的磨损和过时问题一直在加剧。耗尽其寿命的热力和水力发电站设备的容量正在增加。根据现有的预测性评估,对于现有的更新速度和已建立的使用装机容量为49/100或8400万千瓦时的发电设备的方法,到2005年将耗尽其使用寿命。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号