Construction organization and technology: construction of the main concrete structures of the vilyui III hydroelectric station

机译:施工组织与技术:维尤伊三期水电站主要混凝土结构施工

获取原文
获取原文并翻译 | 示例
       

摘要

Placement of concrete in the main structures of the Vilyui III hydrostation [1] has been being carried out since 1987 at an annual rate of 30, 000-67, 000 m~3 with a maximum monthly rate of 10, 000 M~3. Concreting has been carried out year-round. The volume of concrete placed in winter months decreased by a factor of 3-5 compared with summer. At the end of 1997 about 90/100 of the design volume of concrete was placed. The average annual outside air temperature in the construction region, according to the contract design data, is -9.7 deg. C, in the coldest month (January) -37.8 deg. C and in the warmest (July) =16.9 deg. C.
机译:自1987年以来,就一直在Vilyui III水电站的主要结构中浇筑混凝土[1],每年的使用速度为30,000-67,000 m〜3,最大月使用率为10,000 M〜3。全年进行灌浆。与夏季相比,冬季放置的混凝土量减少了3-5倍。在1997年底,放置了大约90/100的混凝土设计量。根据合同设计数据,建筑区域的年平均外部气温为-9.7度。 C,在最冷的月份(一月)-37.8度。 C,最热(7月)= 16.9度。 C。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号