首页> 外文期刊>Hydrological sciences journal >Comparison of design peak flow estimation methods for ungauged basins in Iran
【24h】

Comparison of design peak flow estimation methods for ungauged basins in Iran

机译:伊朗未凝固盆地设计峰流量估计方法的比较

获取原文
获取原文并翻译 | 示例
           

摘要

ABSTRACT Determining the catchment design peak flow is crucial in hydrological practice. In this paper, the conceptual rainfall–runoff model EBA4SUB (Event-Based Approach for Small and Ungauged Basins) was applied in six catchments in Iran. The aims were to test EBA4SUB in reconstructing runoff hydrographs for the investigated case studies and to provide a suitable alternative for the review and updating of design peak flow estimation in Iran. The EBA4SUB output was compared with previous studies on selected catchments. The results show, for all case studies, a large variability in the peak flow values; the EBA4SUB model gave flow values similar to the other methodologies. The EBA4SUB model can be recommended for the following reasons: (i) it minimizes the subjectivity of the modeller. (ii) its modules are based on state-of-the-art procedures, which have been appropriately optimized for ungauged basins; and (iii) it furnishes the whole design flood hydrograph.
机译:摘要确定集水区设计峰流动在水文实践中至关重要。在本文中,在伊朗的六个集水区应用了EBA4SUB(基于事件的小和未凝固盆地的方法)。目的是测试EBA4SUB在重建调查案例研究的径流水文照片中,并为伊朗的设计峰流量估算提供合适的替代方案。将EBA4SUB输出与先前关于所选集水集液的研究进行比较。结果表明,对于所有案例研究,峰值流量值的巨大可变性; EBA4SUB模型具有类似于其他方法的流量值。由于以下原因,可以推荐EBA4SUB模型:(i)它最大限度地减少了典型员的主观性。 (ii)其模块基于最先进的程序,这些程序已适当针对未凝固的盆地进行优化; (iii)它提供整体设计泛滥的水文。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号