首页> 外文期刊>Hydrological ProcHydrological Processesrnesses >Factors affecting the measurement of the vertical hydraulic conductivity of a streambed sediment using standpipe tests
【24h】

Factors affecting the measurement of the vertical hydraulic conductivity of a streambed sediment using standpipe tests

机译:使用立管试验影响测量河床沉积物垂直水力传导率的因素

获取原文
获取原文并翻译 | 示例
           

摘要

The vertical hydraulic conductivity () of a stream or lake sediment is often determined in the field using standpipe tests. Calculation of is based on the assumption that the hydraulic head in the pipe is equal to that of the stream or lake stage. In this work, a modified equation for is developed for the standpipe test which is applicable when this assumption is not valid. The equation involves not only the hydraulic head at different times but also the difference in the hydraulic head () between the groundwater level and river stage. The effects of certain factors on , such as the ratio of the hydraulic head at different times (/), the difference , and the initial water table height (), are also discussed. The results show that when / is constant, the relative error () in increases with the ratio /. Furthermore, if /  <  0.05, then for any value of /, is less than 5% using the modified equation. Also, if / is large, hydraulic head readings with larger / ratios must be used to avoid large values. The results of a field test also indicate that the error in decreases as the value of increases. Copyright © 2013 John Wiley & Sons, Ltd.
机译:溪流或湖泊沉积物的垂直水力传导率()通常在野外使用立管测试确定。的计算基于以下假设:管道中的水头等于河流或湖泊段的水头。在这项工作中,为竖管试验开发了一个修正方程,该假设在该假设无效时适用。该方程不仅涉及不同时间的水头,还涉及地下水位和河流水位之间的水头()。还讨论了某些因素对的影响,例如液压头在不同时间的比率(/),差值和初始水位高度()。结果表明,当/恒定时,相对误差()随比率/增大。此外,如果/ <0.05,则使用修改后的方程,对于/的任何值,小于5%。同样,如果/大,则必须使用具有大/比率的液压头读数,以避免大值。现场测试的结果还表明,误差随着值的增加而减小。版权所有©2013 John Wiley&Sons,Ltd.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号