Increasing leakage at Pacific Gas and Electric Company's Strawberry Dam signaled a dilemma with the 1916-vintage structure ― a dilemma that likely faces, or will face, a growing number of dam owners and operators owing to the aging of dams across North America. PG&E's approach provides a textbook solution to such problems, though the utility encountered a good deal more work than it had expected. Leakage through the dam (primarily through the structure's nine expansion joints) is measured at a toe weir. From 1969 through 1986, leakage averaged about 6 cubic feet per second (cfs) with a full reservoir. In 1987, the leakage rate jumped to about 13 cfs and continued to progressively increase to a maximum of about 21 cfs by 1998.
机译:太平洋天然气和电力公司的草莓坝的泄漏量增加,预示着1916年老式结构的两难境地-由于北美大坝的老化,这一困境可能面临或将面临越来越多的水坝所有者和运营商。 PG&E的方法为此类问题提供了教科书解决方案,尽管该实用程序遇到了比预期更多的工作。通过坝的泄漏(主要是通过结构的9个伸缩缝)在脚趾堰处进行测量。从1969年到1986年,一个充满水的储层平均泄漏速度约为6立方英尺/秒。 1987年,泄漏率跃升至约13 cfs,并继续逐步增加,到1998年达到最大约21 cfs。

著录项

  • 来源
    《Hydro review》 |2003年第2期|p.52-5478|共4页
  • 作者

    Erick Larson;

  • 作者单位

    Pacific Gas and Electric Company, P.O. Box 770000, Mail Code N11D, San Francisco, CA 94177;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 发电、发电厂;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号