Granite Canal: Providing Fish Habitat and Renewable Generation

机译:花岗岩运河:提供鱼类栖息地和可再生能源

获取原文
获取原文并翻译 | 示例
           

摘要

In developing the 40-MW Granite Canal project in Canada, Newfoundland and Labrador Hydro had two goals: to build a new facility for renewable power generation and to protect the environment. The resulting development mitigates negative effects on fish while meeting needs for electricity in the province. The new 40-MW Granite Canal prqj-ect provides 220 gigawatt-hours (GWh) of electricity a year to Newfoundland and Labrador Hydro's grid. After Newfoundland and Labrador Hydro's system planning department projected in 1999 that deficits in capacity and energy would occur after 2002, the utility decided to develop Granite Canal as one of many sources intended to meet these deficits. The project is near Meel-paeg Reservoir within the Bay d'Espoir Hydroelectric Generating System, about 80 kilometers northwest of Newfoundland and Labrador Hydro's 612-MW Bay d'Espoir station. (See Figure 1.)
机译:纽芬兰和拉布拉多水电在加拿大开发40兆瓦的花岗岩运河项目时,有两个目标:建立新的可再生能源发电设施和保护环境。由此产生的发展减轻了对鱼类的负面影响,同时满足了该省的电力需求。新的40兆瓦花岗岩运河项目每年为纽芬兰和拉布拉多水电公司的电网提供220吉瓦时(GWh)的电力。在纽芬兰和拉布拉多水电公司的系统规划部门于1999年预测在2002年之后将出现容量和能源的短缺之后,该公用事业公司决定开发花岗岩运河作为旨在解决这些不足的众多资源之一。该项目位于埃斯普尔湾水力发电系统Meel-paeg水库附近,距纽芬兰西北约80公里,以及拉布拉多水电站的612兆瓦埃斯皮尔湾电站。 (参见图1。)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号