首页> 外文期刊>Hydro review >401 Water Quality Certification: Negotiating A 'Common Sense' Result
【24h】

401 Water Quality Certification: Negotiating A 'Common Sense' Result

机译:401水质认证:谈判“常识”结果

获取原文
获取原文并翻译 | 示例
           

摘要

During relicensing of its 48-MW Lake Chelan project, Chelan County Public Utility District worked with the state of Washington to craft a 401 water quality certificate that balances competing requirements to protect endangered fish and to ensure high water quality. In the Chelan River in Washington, meeting the existing numerical criteria in the Washington Water Quality Standards for water temperature and providing flows with the greatest value for fish habitat were conflicting objectives. During Federal Energy Regulatory Commission (FERC) relicensing of its 48-MW Lake Chelan Hydro Project on this river, Chelan County Public Utility District (PUD) faced this dilemma. Instead of adhering to the numerical criteria, the goal of the relicensing became to determine how to balance the competing requirements of the Endangered Species Act (to protect salmon and steelhead) and the Clean Water Act (to protect water quality). River flows could be higher (bad for fish) and colder (good for fish), or lower (good for fish) and warmer (bad for fish).
机译:在获得其48兆瓦奇兰湖项目的许可时,奇兰县公共事业区与华盛顿州合作制定了401水质证书,该证书平衡了竞争的要求,以保护濒临灭绝的鱼类并确保高水质。在华盛顿的车兰河上,要达到华盛顿水质标准中有关水温的现有数字标准并为鱼类栖息地提供最大价值是矛盾的目标。在联邦能源管理委员会(FERC)在这条河上的48兆瓦奇兰湖水电项目获得许可的过程中,奇兰县公共事业区(PUD)面临这一难题。代替遵守数字标准,重新许可的目的是确定如何平衡《濒临灭绝物种法》(保护鲑鱼和硬皮鱼)和《清洁水法》(保护水质)的竞争要求。河流流量可能较高(对鱼类不利),较冷(对鱼类有利),或较低(对鱼类有利)和较暖(对鱼类不利)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号