首页> 外文期刊>Hydro review >Swift Power reaches MOU for 20-MW Dasque Cluster
【24h】

Swift Power reaches MOU for 20-MW Dasque Cluster

机译:Swift Power达到20兆瓦Dasque群集的谅解备忘录

获取原文
获取原文并翻译 | 示例
           

摘要

Swift Power Corp. and the Kitselas First Nation signed a memorandum of understanding to work together to develop the 20-MW Dasque Cluster hydroelectric project.rnThe project is proposed for a site 20 kilometers west of Terrace, B.C., within the First Nation's traditional territory. The run-of-river hydropower cluster is proposed for two creeks - Dasque Creek and Middle Creek.rnSwift Power said it would consult with the First Nation on all phases of the project. A working group will oversee implementation of the accord, and promote and enhance communication. Swift Power said.
机译:Swift Power Corp.和Kitselas First Nation签署了一份谅解备忘录,共同开发20兆瓦的Dasque集群水力发电项目。该项目计划在不列颠哥伦比亚省Terrace市以西20公里的传统领土内进行。拟议中的两河小河-达斯克河和米德尔克里克将成为沿河水电集群。斯威夫特电力公司表示将在该项目的所有阶段与第一民族协商。一个工作组将监督该协议的实施,并促进和加强沟通。 Swift Power说。

著录项

  • 来源
    《Hydro review》 |2009年第4期|74-75|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号