From Concept to Construction: Steps to Developing a Hydro Project

机译:从概念到建设:开发水电项目的步骤

获取原文
获取原文并翻译 | 示例
           

摘要

Development of a new hydroelectric project at an existing dam requires a number of steps. American Municipal Power is working with engineering consultant MWH to develop six such projects. This article shares experiences and lessons learned, providing valuable insight for other project developers.rnThere are many steps involved in taking a hydroelectric project from the initial concept to construction. American Municipal Power Inc. (AMP) built and has operated the 42-MW Belleville project, a run-of-river plant, for ten years. AMP currently is developing five similar projects on the Ohio River. Currently, this is the largest development of new run-of-river hydroelectric generation in the U.S.
机译:在现有大坝上开发新的水力发电项目需要许多步骤。美国市政电力正在与工程顾问MWH合作开发六个此类项目。本文分享了经验和教训,为其他项目开发人员提供了宝贵的见解。从最初的概念到建设,水电项目涉及许多步骤。美国市政电力公司(AMP)建造并运营了一个42兆瓦的Belleville项目,这是一条河流上游的工厂,已经运行了十年。 AMP目前正在俄亥俄河上开发五个类似的项目。目前,这是美国新型河道水力发电的最大发展。

著录项

  • 来源
    《Hydro review》 |2010年第3期|p.42-4952-56|共13页
  • 作者单位

    Development with American Municipal Power Inc. (AMP);

    105-MW Meldahl project;

    84-MW Cannelton. 72-MW Smithland. And 35-MW Willow Island projects;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号