首页> 外文期刊>Hydro review >Endangered Species Consultation: Why Does iT Take so Long?
【24h】

Endangered Species Consultation: Why Does iT Take so Long?

机译:濒危物种咨询:为什么需要这么长时间?

获取原文
获取原文并翻译 | 示例
           

摘要

The percentage of projects requiring endangered species consultations, particularly formal consultations, has increased substantially. Most alarming is the increase in the amount of time required. While the regulatory 135-day timeframe would not necessarily significantly add to the amount of time the licensing process takes, in practice, the consultation process clearly significantly delays the licensing process. Delays in the licensing process ultimately result in the delay in implementing much-needed environmental protection measures. The numbers of formal consultations are likely to continue into the future, particularly with the current increased interest in hydropower development.
机译:需要濒危物种磋商,特别是正式磋商的项目所占比例大大增加。最令人震惊的是所需时间的增加。尽管法规规定的135天期限不一定会大大增加许可过程所需的时间,但实际上,咨询过程显然会大大延迟许可过程。许可流程的延迟最终会导致延迟实施急需的环境保护措施。正式磋商的数量可能会持续到未来,特别是在当前对水电开发的兴趣日益浓厚的情况下。

著录项

  • 来源
    《Hydro review》 |2014年第3期|8-10121416|共6页
  • 作者

    Alan D. Mitchnick;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号