首页> 外文期刊>Hydro review >The Future of Energy
【24h】

The Future of Energy

机译:能源的未来

获取原文
获取原文并翻译 | 示例
       

摘要

With Entergy's decision [in October 2015] to close the Pilgrim nuclear plant in Plymouth, Mass., New England has an opportunity to increase the supply of clean energy to the region. The Pilgrim closure is part of an array of market and environmental pressures that are shutting down the oil, coal and nuclear plants that have sustained the region for years. Left to the market, this zero-carbon resource will be replaced by a natural gas-fired power plant - a big step backward in the state and region's hopes to reduce carbon emissions. Fortunately, Massachusetts Governor Charlie Baker signed an energy bill in August 2016 that will allow the state to participate in a big regional effort to build clean energy infrastructure that will efficiently bring substantial wind and hydro-power resources to consumers at reasonable prices.
机译:Entergy于[2015年10月]决定关闭马萨诸塞州普利茅斯的朝圣者核电站,新英格兰将有机会增加对该地区的清洁能源供应。朝圣者禁运是一系列市场和环境压力的一部分,这些压力正在关闭维持该地区多年的石油,煤炭和核电站。这种零碳资源将留给市场,将被天然气发电厂取代,这是该州和该地区减少碳排放的希望的一大进步。幸运的是,马萨诸塞州州长查理·贝克(Charlie Baker)于2016年8月签署了一项能源法案,该法案将使该州参与建立清洁能源基础设施的区域性努力,该基础设施将以合理的价格有效地为消费者带来大量风能和水力发电资源。

著录项

  • 来源
    《Hydro review》 |2016年第9期|30-30|共1页
  • 作者

    Ed Krapels; Stan Blazewicz;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:03:37

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号