Some Innovations in Design, Engineering, and Construction of the Karahnjukar Project

机译:Karahnjukar项目的设计,工程和施工中的一些创新

获取原文
获取原文并翻译 | 示例
           

摘要

Development of the 690-mw Karahnjukar hydroelectric facility in Iceland has presented project owner Landsvirkjun with many unique challenges.These include a project location with numerous faults and difficult site geology, as well as the problems inherent with major construction in a climate where snow is on the ground eight months of the year. In the process of planning for and building this project, Landsvirkjun has developed many design, engineering, and construction innovations to keep the project on schedule and budget.The timeline for the development of Karahnjukar is particularly important because it is being built to provide electricity to the Fjaroaal aluminum smelter, owned by Alcoa of the United States.
机译:冰岛690兆瓦的Karahnjukar水力发电站的开发给项目所有者Landsvirkjun带来了许多独特的挑战,包括项目位置众多,断层多,场地地质困难,以及在积雪多雨的气候下进行大型施工所固有的问题。一年中的八个月。在规划和建设该项目的过程中,Landsvirkjun开发了许多设计,工程和施工创新,以使该项目按计划进行和按预算进行。Karahnjukar的开发时间表尤为重要,因为正在建造该项目的目的是为美国铝业公司(Alcoa)拥有的Fjaroaal铝冶炼厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号