首页> 外文期刊>Hydro Review Worldwide >Cleaning Water Conveyances: Hydro Tasmania Boosts Power Production
【24h】

Cleaning Water Conveyances: Hydro Tasmania Boosts Power Production

机译:清洁水输送:塔斯马尼亚水电促进发电

获取原文
获取原文并翻译 | 示例
           

摘要

Over the years, the buildup of bacterial deposits and slime on the inside of water conveyances resulted in significant electricity losses at Hydro Tasmania's 29 hydroelectric facilities. The utility is in the midst of a testing and cleaning program that should yield an increase of more than 67 gigawatt-hours of electricity production each year at existing facilities.
机译:多年来,水运输工具内部积聚的细菌和粘泥导致塔斯马尼亚水电公司的29个水力发电站的电力严重损失。该公用事业处于一项测试和清洁计划的中间,该计划将使现有设施每年的发电量增加超过67吉瓦时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号