As regulators work to understand what caused a fatal accident at Russia's largest hydro-power plant, repairs to the plant are underway and partial production has resumed. The long-term plan to restore the plant calls for the installation of ten new hydro units by 2014. JSC Power Machines won a RUR 11.7 billion (US$392 million) contract to supply the equipment.
展开▼
机译:随着监管机构努力了解是什么原因导致了俄罗斯最大的水力发电厂的致命事故,该厂正在进行维修,部分生产已经恢复。恢复工厂的长期计划要求在2014年前安装10个新的水力发电机组。JSC Power Machines获得了117亿卢布(合3.92亿美元)的设备供应合同。
展开▼