...
首页> 外文期刊>Hydro Review Worldwide >Other Hydro Development in Latin America
【24h】

Other Hydro Development in Latin America

机译:拉丁美洲的其他水电开发

获取原文
获取原文并翻译 | 示例

摘要

Brazil is definitely not the only country in Latin America where hydro development work is ongoing. Below is a snapshot of hydro activity in some other countries in the region. Argentina: The 9.4 MW Salto Andersen project, in Rio Negro Province, began operating in June 2011. Investment in the project, built by Spanish group Isolux Corsan, is expected to hit US$27 million. And in October 2010, the federal government signed a contract with authorities in Neuquen province, giving the go-ahead for 640 MW Chihuido I. The plant will contain four turbines and will be developed by a temporary business union consisting of regional firms Electroingenieria, Constructora OAS and Hidrocuyo. Construction is expected to take four years.
机译:巴西绝对不是拉丁美洲唯一进行水电开发工作的国家。以下是该地区其他一些国家水文活动的快照。阿根廷:里约内格罗省的9.4兆瓦Salto Andersen项目于2011年6月开始运行。由西班牙Isolux Corsan集团建造的该项目的投资预计将达到2700万美元。 2010年10月,联邦政府与内乌肯省当局签署了一项合同,批准了640兆瓦Chihuido I电厂的建设。该电厂将装有4台涡轮机,由一个由地区公司Electroingenieria,Constructora组成的临时工会开发OAS和Hidrocuyo。建设预计需要四年。

著录项

  • 来源
    《Hydro Review Worldwide》 |2011年第4期|p.20|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号