...
首页> 外文期刊>Hydro Review Worldwide >Update on hydro development in Nepal
【24h】

Update on hydro development in Nepal

机译:尼泊尔水电开发最新动态

获取原文
获取原文并翻译 | 示例

摘要

Production at Nepal's 60 MW Kulekhani 1 project was cut in half by a short circuit in a cable that occurred in February. The project - on the Kulekhani River - is the only reservoir-type hydroelectric plant in the country, according to owner the Nepal Electricity Authority (NEA). Kulekhani 1 is intended to provide power for peak demand and emergencies, although NEA said recent rainfall in the area should allow other run-of-river facilities to keep pace with demand.
机译:由于2月份发生的电缆短路,尼泊尔60兆瓦Kulekhani 1项目的产量减少了一半。据业主尼泊尔电力局(NEA)称,该项目-位于库勒卡尼河上-是该国唯一的水库式水力发电厂。 Kulekhani 1旨在为高峰需求和紧急情况提供电力,尽管NEA表示,该地区最近的降雨将使其他过河设施能够跟上需求的步伐。

著录项

  • 来源
    《Hydro Review Worldwide 》 |2013年第2期| 6-6| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号