首页> 外文期刊>Hydro Review Worldwide >Multi-faceted Challenges at Matala Dam
【24h】

Multi-faceted Challenges at Matala Dam

机译:马塔拉水坝的多方面挑战

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Despite the adversities faced by the SNCL Engineering team, the works were successfully completed and accepted by PRODEL. SNCL, working together with all of its suppliers, managed to achieve an understanding with them in regard to the quality of works required to ensure successful completion. Given the experience gained from executing this EPC project, some of the principal lessons learned by SNCL include: 1.Initial design concepts should have taken into consideration European standards as being predominant, instead of North American standards from the start, considering the project location and supplier capabilities.
机译:尽管SNCL工程团队面临着逆境,但工程还是成功完成并被PRODEL接受。 SNCL与所有供应商一起努力,就确保成功完成所需的工程质量与他们达成了共识。鉴于从执行该EPC项目中获得的经验,SNCL获得的一些主要经验教训包括:1.最初的设计概念应从项目开始时的欧洲标准出发,而不是从北美标准开始就以欧洲标准为主导。供应商能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号