首页> 外文期刊>Human and ecological risk assessment >Environmental hazard assessment of coal ash disposal at the proposed Rampal power plant
【24h】

Environmental hazard assessment of coal ash disposal at the proposed Rampal power plant

机译:拟建的拉姆帕尔发电厂处理煤灰的环境危害评估

获取原文
获取原文并翻译 | 示例

摘要

A proposed coal-fired power plant at Rampal, Bangladesh will produce over 38 million tons of ash during 60 years of operation at 90% electric load generation capacity. The ash disposal pond would be full in twelve years even if half of all fly ash is used in concrete and brick production, leaving at least 20 million tons of ash with a disposal plan that is limited to surface impoundment and unlined fills, which are known to cause groundwater and surface water pollution. At Rampal, probable storm tides of 7.4 meters would breach the ash pond walls during the operational life of the coal plant, potentially resulting in catastrophic failure and massive spills of ash. Seasonal monsoon flooding would cause the ash pond itself to overflow, releasing huge volumes of contaminated water. Ash disposal for the proposed coal-fired power plant at Rampal, Bangladesh, would release toxic heavy metals into the waterways of the Sundarbans Delta and Bay of Bengal, which is a World Heritage Site and includes globally important mangroves, endangered aquatic species, and a fishery that feeds hundreds of thousands of poor people. The economic damage cost of the Rampal Plant could exceed $US 100 million dollars per year.
机译:孟加拉国兰帕尔市拟建的燃煤发电厂将在运行60年的过程中,以90%的发电量产生超过3,800万吨的灰烬。即使所有粉煤灰的一半用于混凝土和砖块生产,粉煤灰处理池也将在十二年内装满,已知至少有2000万吨的粉尘处理计划仅限于地面蓄水和未加衬料的填埋场。造成地下水和地表水污染。在Rampal,在燃煤电厂运营期间,可能会有7.4米的风暴潮冲破灰池壁,可能导致灾难性故障和大量灰烬溢出。季节性的季风性洪水会导致烟灰池本身溢出,释放出大量的污水。拟议中的孟加拉国拉姆帕尔燃煤电厂的灰烬处置将有毒重金属释放到世界遗产桑德拉班斯三角洲和孟加拉湾的水道中,该海湾是全球重要的红树林,濒临灭绝的水生物种以及养活成千上万穷人的渔业。兰帕尔工厂的经济损失成本每年可能超过1亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号