首页> 外文期刊>Housing and development reporter >Management, Occupancy Reviews on Hold While Contracts Are Rebid For Project-Based Administrators
【24h】

Management, Occupancy Reviews on Hold While Contracts Are Rebid For Project-Based Administrators

机译:基于项目的管理员拒绝合同时的管理和占用情况审核

获取原文
获取原文并翻译 | 示例
           

摘要

HUD officials told the National Leased Housing Association (NLHA) Section 8 meeting that management and occupancy reviews (MORs) currently are not being conducted on a regular basis in 41 states and the District of Columbia while contracts for project-based contract administrators (PBCA) are being rebid. The short-term contracts currently in effect in those areas do not include MORs as part of the core tasks. At the October 20 NLHA meeting, HUD staff also said they are reexamining the methodology used when owners analyze utility costs for annual and special rent adjustments and utility allowances.
机译:HUD官员在全国租赁房屋协会(NLHA)第8节会议上说,目前在41个州和哥伦比亚特区,没有定期进行管理和入住审查(MOR),而基于项目的合同管理人(PBCA)的合同正在被竞标。目前在这些领域生效的短期合同没有将MORs作为核心任务的一部分。在10月20日的NLHA会议上,HUD工作人员还表示,他们正在重新审查业主分析年度和特殊租金调整以及公用事业津贴的公用事业成本时使用的方法。

著录项

  • 来源
    《Housing and development reporter》 |2011年第cd21期|p.659|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号