...
首页> 外文期刊>Home power >Maximizing Performance of Grid-Tied PV Systems
【24h】

Maximizing Performance of Grid-Tied PV Systems

机译:最大化并网光伏系统的性能

获取原文
获取原文并翻译 | 示例

摘要

APV system's job is to produce as much energy as possible. Maximizing system performance means getting the best return on investment, as utility bills are reduced or even eliminated. More energy (kWh) produced means a quicker payback time and a greater return on investment. With an off-grid system, an optimally performing system will save on generator run-time and thus fuel and longevity expense, as well fulfill its most important function: providing enough power when you need it. If you are comparing PV system bids, it's wise to look at the cost per kWh ($/kWh) of different proposals. PV system initial cost is often talked about in dollars per watt. The problem with this metric is that, depending on siting and shading factors, the same size PV system could perform very differently depending upon variables-for example, a 5 kW system facing true south is likely to produce more energy over its lifetime than if it was on an east-facing roof.
机译:APV系统的工作是产生尽可能多的能量。使系统性能最大化意味着减少或什至消除水电费,从而获得最佳的投资回报。产生的更多电能(kWh)意味着更快的投资回收期和更大的投资回报率。借助离网系统,性能最佳的系统将节省发电机的运行时间,从而节省燃料和使用寿命,并履行其最重要的功能:在需要时提供足够的电力。如果要比较光伏系统的投标,明智的做法是查看不同提案的每千瓦时成本($ / kWh)。光伏系统的初始成本通常以每瓦美元为单位。该度量标准的问题在于,取决于选址和阴影因素,相同大小的光伏系统的性能可能会因变量而有很大不同,例如,面向真实南方的5 kW系统在其整个使用寿命中可能会产生比其更大的能量。在朝东的屋顶上。

著录项

  • 来源
    《Home power 》 |2016年第172期| 48-53| 共6页
  • 作者

    Lena Wilensky;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号