...
首页> 外文期刊>Highways >Trief Triumphs at Tyne Tunnels Tolls
【24h】

Trief Triumphs at Tyne Tunnels Tolls

机译:泰恩河隧道通行费的特里夫胜利

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A three year project to build an extra road tunnel under the River Tyne has benefited from the use of Brett Landscaping Trief Containment Kerbs, ensuring driver and staff safety at toll booths. The toll booths situated at the North Plaza cater for 10 lanes of traffic, but with over 11 million vehicles expected to pass through the tunnels every year, traffic management and safety at the tolls is paramount, as Andrew Gill, Specification Product Manager at Brett Landscaping explains: 'To better manage traffic through the tolls and to protect the booths themselves, Brett Landscaping Trief containment kerbs were specified by main contractor CNK Civils Ltd.
机译:一项为期三年的在泰恩河下建造一条额外的公路隧道的项目得益于Brett绿化Trief围护结构的使用,确保了收费站驾驶员和员工的安全。布雷特园林绿化规范产品经理安德鲁·吉尔(Andrew Gill)是位于北广场(North Plaza)的收费站,可容纳10条车道,但每年预计有超过1100万辆车辆通过隧道,收费处的交通管理和安全至关重要。解释说:“为了更好地管理通过收费站的交通并保护摊位本身,总承包商CNK Civils Ltd.指定了Brett绿化Trief围堵路缘。

著录项

  • 来源
    《Highways》 |2012年第1期|p.60|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号