...
首页> 外文期刊>Highways >Contracts round-up
【24h】

Contracts round-up

机译:合同圆满

获取原文
获取原文并翻译 | 示例

摘要

1.Contractors have until 16 April to try to prequalify for a £3.8m scheme to replace Clyde Bridge in Lanark for South Lanarkshire Council. The project comprises a 90-metre single span proprietary steel bridge to replace the existing reinforced concrete bridge structure, plus a stretch of wide carriageway. The proposed approach carriageway will follow a different route and the work will include new approach roads to the North and South to link to the existing C29 Pettinain Road. Five contractors will be shortlisted for the job, which is expected to start in January 2022 and take 18 months to complete. 2. Dyer & Butler has bagged an estimated £8.5m deal for work at the Gablecross roundabout on Stratton Street for Swindon Borough Council. The job is part of a major £72.5m project to improve roads in the east of Swindon before work begins on the New Eastern Villages residential scheme that will see 8,000 houses built to the east of the A419. Atkins is working for the council on the Gablecross scheme and work is expected to commence this summer.
机译:1.强制转让者截至4月16日,试图为£3.8米的计划进行资格,以取代南兰卡克郡南兰克兰卡的克莱德桥。该项目包括一个90米的单跨专用钢桥,以取代现有的钢筋混凝土桥梁结构,加上一条宽阔的行车道。拟议的方法行车道将遵循不同的路线,工作将包括向北和南方的新方法,以联系现有的C29 PETTINAIN路。五名承包商将为工作遗憾,预计将于2022年1月开始,需要18个月才能完成。戴尔&巴特勒在斯特拉顿街Glatton Street为斯文街道为斯文街道为斯文州斯文州斯文州斯文斯议会汇编了估计的850万英镑。该工作是主要的7250万英镑项目的一部分,以改善斯曼登东部的道路,然后在新的东部村庄居住计划中始于A419的东部建造了8,000所房屋。阿特金斯正在为理事会努力,甘蓝计划,预计今年夏天的工作将开始。

著录项

  • 来源
    《Highways 》 |2021年第2期| 9-9| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号