...
【24h】

Big plans for 2019

机译:2019年的大计划

获取原文
获取原文并翻译 | 示例

摘要

The roof of the Helsinki airport's terminal is currently being fitted with new solar panels. They belong to Finavia's solar plant, whose first application was opened just under two years ago. Next year, more panels will be installed on the facade of the parking complex, which will then be open. Currently, 100% of Helsinki airport's energy is produced using renewable energy sources. The power plant, which is located on the roof, produces approximately 5% of the terminal extensions' electricity. The rest of the airport's electricity is produced by wind power. Typically, airport emissions are caused by the energy consumption of buildings, lighting and vehicles. The production of renewable energy was one of the most important factors in the airport's drive towards achieving its certified carbon neutral status. Initial panels were installed on the terminal roof during the summer of 2017. According to the airport, the system's energy production has corresponded to expectations. The second phase will be completed this spring, and the new section should produce 330 kWp of solar power. Solar panels earmarked for the car park will be targeting electric cars.
机译:赫尔辛基机场的屋顶目前正在配有新的太阳能电池板。它们属于Finavia的太阳能厂,其首批申请仅次于两年前。明年,将在停车场的外观上安装更多面板,然后将开放。目前,100%的赫尔辛基机场的能源是使用可再生能源生产的。位于屋顶上的发电厂产生大约5%的终端延伸电力。机场的其余电力由风力发电。通常,机场排放是由建筑物,照明和车辆的能耗引起的。可再生能源的生产是机场朝着实现其认证碳中性地位的最重要因素之一。初始面板在2017年夏季安装在终端屋顶上。根据机场,系统的能源生产与期望相符合。第二阶段将完成这一弹簧,新部分应生产330千瓦的太阳能。用于停车场的太阳能电池板将瞄准电动汽车。

著录项

  • 来源
    《Ground handling international 》 |2019年第3期| 44-44| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号