首页> 外文期刊>Ground Engineering >Evaluation of prop loads at Channel Tunnel Rail Link Contract 430-Ashford tunnels
【24h】

Evaluation of prop loads at Channel Tunnel Rail Link Contract 430-Ashford tunnels

机译:评估Channel Tunnel Rail Link Contract 430-Ashford隧道的支撑载荷

获取原文
获取原文并翻译 | 示例
           

摘要

Conventional design methods for braced excavations are commonly found to overestimate the prop loads measured during subsequent construction (Powrie & Batten, 2000, Twine & Roscoe, 1999). This may result in the over-design of support systems. The distributed prop load (DPL) method provides an alternative method of estimating temporary prop loads based on case histories. This paper compares loads found using the DPL method and those given by conventional wall analysis with loads measured during the early stages of construction of the Channel Tunnel Rail Link (CTRL) Contract 430. It demonstrates that the DPL loads are greater than those measured, but significantly less than those found by analysis. The DPL method is then applied to forthcoming areas of construction. The subsequent reduction in prop load predictions allowed review of the method of propping and resulted in cost savings of approximately £175,000.
机译:通常发现,传统的支撑开挖设计方法会高估后续施工期间测得的支撑载荷(Powrie&Batten,2000; Twine&Roscoe,1999)。这可能会导致支持系统的过度设计。分布式支撑载荷(DPL)方法提供了一种基于案例历史记录估算临时支撑载荷的替代方法。本文将使用DPL方法发现的载荷与常规墙体分析得出的载荷与在Channel Tunnel Rail Link(CTRL)Contract 430的早期施工阶段测得的载荷进行了比较。这表明DPL载荷大于测得的载荷,但明显少于分析得出的结果。然后将DPL方法应用于即将到来的建筑领域。随后减少的支撑载荷预测值使得可以回顾支撑方法,并节省了约175,000英镑的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号