摘要

Minimising environmental impact while maximising economic benefits meant that innovation, sustainable solutions and value engineering were at the forefront of design and planning. The team put a community support programme in place that organised 105 presentations attended by more than 6,500 people.Safety was high on the agenda and to date more than 1.4M man hours have been worked without a reportable accident. Four years into this major civil engineering project the tunnel and the new stretch of A3 have been successfully constructed on time and to budget.
机译:最小化环境影响,同时最大化经济效益,意味着创新,可持续解决方案和价值工程处于设计和规划的最前沿。该团队制定了一项社区支持计划,组织了105场演讲,有6,500多人参加了会议,安全问题已被提上议事日程,迄今为止,已经有超过140万工时的工作,没有可报告的事故。这项重大的土木工程项目已完成四年,隧道和新A3桥段已按时按预算成功建造。

著录项

  • 来源
    《Ground Engineering》 |2011年第1期|p.27|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号