首页> 外文期刊>Greenwire >Report: Dim financial outlook for planned La. plastics plant
【24h】

Report: Dim financial outlook for planned La. plastics plant

机译:报告:计划LA的暗淡金融展望。塑料厂

获取原文
获取原文并翻译 | 示例
           

摘要

A new report finds that the planned Formosa Plastics Group facility in St. James Parish, La., would be a bad investment for both Formosa and the community. The report, titled "Formosa's Louisiana Project: Wrong Products, Wrong Time, Wrong Place, Wrong Finances," was released today by the Institute for Energy Economics and Financial Analysis (IEEFA). It found that in addition to community concerns about pollution, the plastics facility would likely earn 20% less than its backers claimed in 2018. "We're seeing trouble in the industry, and the Formosa project is, in our view, it would be a very shortsighted investment," said Suzanne Mattei, an attorney with IEEFA and one of the report's authors. Formosa's Louisiana operation has not yet responded to a request for comment.
机译:一份新报告发现,洛杉矶詹姆斯教区的计划福尔多斯塑料集团设施将是对福尔摩沙和社区的糟糕投资。该报告,标题为“Formosa的路易斯安那州项目:错误的产品,错误的时间,错误的地方,错误的财务”,由能源经济学和财务分析研究所(IEEFA)发布。它发现除社区涉及污染的担忧外,塑料设施可能比2018年索赔的支持者低20%。“我们看到了在行业的麻烦,福尔摩沙项目在我们看来,它将是一个非常短的投资,“Suzanne Mattei是IEEFA的律师和该报告的作者之一。 Formosa的路易斯安那州运营尚未回应评论请求。

著录项

  • 来源
    《Greenwire》 |2021年第23期|12-13|共2页
  • 作者

    Jacob Wallace;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号