首页> 外文期刊>Greenwire >Shore town sees political revenge in dune destruction flap
【24h】

Shore town sees political revenge in dune destruction flap

机译:岸镇在沙丘破坏翻盖中看到了政治报复

获取原文
获取原文并翻译 | 示例
           

摘要

New Jersey's threat to make a shore town rip out a sea wall and other oceanfront structures feels like political retribution, North Wildwood officials say. North Wildwood Mayor Patrick Rosenello, a Republican, said yesterday it's more than a coincidence that shortly after he criticized Democratic Gov. Phil Murphy's reopening of the shore economy amid the coronavirus outbreak, the state Department of Environmental Protection hit his town with numerous violations notices and threats of costly repair work. North Wildwood officials say the sea wall was built without a required coastal construction permit - but with full knowledge of state officials - only after years of requests for storm protection were ignored by state and federal authorities, which the city says ultimately led to storms wrecking the dunes and wetlands. In a statement yesterday, Rosenello said the Army Corps of Engineers and the Department of Environmental Protection missed deadlines and failed to build a beach protection project in the area for over six years, leading to serious erosion and destruction of dunes. He said the town had spent $10 million of its own money trucking in sand to repair the damage.
机译:北惠华伍德官员表示,新泽西州的威胁要使岸线摧毁了海墙和其他海滨结构。共和党人北怀尔伍德市长Patrick Rosicko昂贵的修复工作威胁。北威尔伍德官员表示,没有所需的沿海建设许可,海墙建造 - 但全面了解国家官员 - 州和联邦当局忽略了多年的暴风保请求,这座城市最终导致破坏破坏破坏沙丘和湿地。在昨天的声明中,Rosenello表示,工程师和环境保护部的陆军队持续截止日期,未能在该地区建立一个超过六年的海滩保护项目,导致沙丘的严重侵蚀和破坏。他说,该镇在沙滩上花了1000万美元的货币货币运输,以修复损害。

著录项

  • 来源
    《Greenwire》 |2020年第jul15期|11-12|共2页
  • 作者

    Wayne Parry;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号