首页> 外文期刊>Green Places >Refill For London Lake
【24h】

Refill For London Lake

机译:伦敦湖笔芯

获取原文
获取原文并翻译 | 示例
           

摘要

Work has begun to clean and refill the St James's Park lake to improve the water quality for wildlife. Last drained in 1987, the lake will be emptied in two sections. A temporary dam will be built down the middle, in order to give wildlife access to water and to an island at all times. Once the water has been drained, silt will be collected and removed and the condition of the sluice gate and base of the lake will be inspected and repaired if necessary. The reedbeds along the banks of the lake will be protected during the works and may be extended following the project. Mark Wasilewski, park manager of St James's Park said: "Silt, leaves, and other materials have accumulated in the lake and we felt that this would be an appropriate opportunity to drain and clean it. A number of interesting objects have been found in the past including wedding rings, cameras, and umbrellas - so I'm curious to see what turns up this time!"
机译:已经开始清洁和补充圣詹姆斯公园湖的工作,以改善野生动植物的水质。最后一次排水是在1987年,该湖将被分两部分清空。中间将修建一个临时水坝,以使野生动植物随时都能获得水和岛屿。排水后,将收集和清除淤泥,并在必要时检查和修复闸门和湖泊底部的状况。沿湖两岸的芦苇床将在工程期间得到保护,并可能在项目实施后进行扩展。圣詹姆斯公园公园经理马克·瓦西洛夫斯基(Mark Wasilewski)说:“湖中积聚了淤泥,树叶和其他材料,我们认为这是排干和清洁湖面的适当机会。在湖中发现了许多有趣的物体。过去包括结婚戒指,相机和雨伞-所以我很想知道这次是怎么回事!”

著录项

  • 来源
    《Green Places》 |2009年第53期|8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号