The Sabalan geothermal field in northwest Iran is currently under development. A single flash cycle has been selected for power generation. The analysis of the proposed design shows the maximum net power output of the plant can reach 31 MW if the pressures of the separator and condenser are 5.5 and 0.3 bar, respectively. To achieve optimum energy utilization, a double flash cycle was also evaluated for power generation. The results indicate the maximum net power output of the plant reaches 49.7 MW if the pressures for the high- and low-pressure steps and condenser are 7.5,1.1, and 0.1 bar, respectively. Mathematical models for energy and exergy flows were developed and implemented in Engineering Equation Solver (EES) software. In the single flash cycle, the energy and exergy of the waste water were calculated as 54.8% and 41.4% of the total available energy and exergy, respectively. The energy and exergy of waste water were respectively calculated as 19.88% and 15.3% of the total available energy and exergy, in the double flash cycle. The parts of the system with largest exergy destruction in both cycles were compared and the overall exergy and energy efficiencies for the power plant were calculated. The total exergy available from production wells at Sabalan was calculated to be 111 MW for the single flash system, and 114MW for the double flash system. The results of the analysis suggest a double flash cycle system for the Sabalan power plant.
机译:伊朗西北部的Sabalan地热田目前正在开发中。已选择单个闪光周期进行发电。对拟议设计的分析表明,如果分离器和冷凝器的压力分别为5.5 bar和0.3 bar,则工厂的最大净功率输出可以达到31 MW。为了实现最佳的能源利用,还对发电的双闪周期进行了评估。结果表明,如果高压步骤和低压步骤以及冷凝器的压力分别为7.5、1.1和0.1 bar,则该工厂的最大净功率输出将达到49.7 MW。在工程方程求解器(EES)软件中开发并实现了能量和火用流的数学模型。在单次闪蒸循环中,废水的能量和火用能分别计算为总可用能量和火用能的54.8%和41.4%。在两次闪蒸循环中,废水的能量和火用能分别计算为总可用能量和火用能的19.88%和15.3%。比较了两个循环中系统的最大火用破坏部分,并计算了电厂的总火用和能源效率。据计算,萨巴兰生产井的总火用单闪系统为111 MW,双闪系统为114 MW。分析结果表明,萨巴兰发电厂采用了双闪蒸循环系统。

著录项

  • 来源
    《Geothermics》 |2012年第7期|p.75-82|共8页
  • 作者单位

    Faculty of Engineering, Kyushu University, No. 418, West Building 2, 744 Motooka, Nishi-ku 819-0395, Japan;

    Faculty of Engineering, Kyushu University, No. 418, West Building 2, 744 Motooka, Nishi-ku 819-0395, Japan;

    Faculty of Engineering and Natural Sciences, University of Iceland, Reykjavik, Iceland;

    Faculty of Science and Engineering, Reykjavik University, Reykjavik, Iceland;

    Faculty of Engineering, Kyushu University, No. 418, West Building 2, 744 Motooka, Nishi-ku 819-0395, Japan;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    energy; exergy; sabalan; flash cycle geothermal power plant; iran;

    机译:能源;火用萨巴兰闪速循环地热发电厂;伊朗;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号