首页> 外文期刊>Geomorphology >Equilibrium or indeterminate? Where sediment budgets fail: Sediment mass balance and adjustment of channel form, Green River downstream from Flaming Gorge Dam, Utah and Colorado
【24h】

Equilibrium or indeterminate? Where sediment budgets fail: Sediment mass balance and adjustment of channel form, Green River downstream from Flaming Gorge Dam, Utah and Colorado

机译:平衡还是不确定?沉积物预算不足的地方:沉积物质量平衡和河道形式调整,火焰谷大坝下游的绿河,犹他州和科罗拉多州

获取原文
获取原文并翻译 | 示例
           

摘要

This study examines bed and bank adjustment in the 105-km reach of the Green River immediately downstream from Flaming Gorge Dam by the use of historical aerial and oblique photographs, analysis of current and abandoned stream-gaging records, and field observations. Although this segment has been previously characterized as sediment deficient, these data show that sediment is accumulating in all reaches and that the bed has not degraded at any location where historical data are available. Adjustment is occurring through a combination of deposition of post-dam sediment and stabilization of pre-dam deposits, resulting in a 10-30% reduction in average width of the channel. All post-dam surfaces are colonized by woody riparian vegetation. The style of channel adjustment varies between geomorphically defined reaches. In canyons dominated by debris fans and gravel-bedded restricted meandering reaches, gravel bars have become inactive and accumulated fine sediment. In the sand-bedded meandering reaches, existing islands have increased in size and new mid-channel islands have formed. In all of these types of reaches, post-dam deposits line the banks and sediment has accumulated in side-channels that previously separated islands from the bank. These findings demonstrate that sediment budgets that show a balance between inputs and outputs cannot necessarily be interpreted to indicate channel equilibrium. A sediment mass balance for 150-km reach between the dam and the first long-term gage indicates approximate balance of inputs and outputs for the pre- and post-dam periods. When uncertainty in budget components is considered, the mass balance is indeterminate. Although the Green River may have been in approximate equilibrium in the pre-dam period, we have shown that channel width is decreasing in the post-dam period. The post-dam deposits constitute a small but a significant component of the sediment budget upstream from the first major tributary. Sediment is supplied to this reach by small tributaries and, to a lesser extent, erosion of pre-dam alluvium. Downstream from the study area, the volume of the post-dam deposits is tiny relative to the volume of sediment input from the first major tributary.
机译:这项研究通过使用历史性的航空和斜向照片,分析当前和废弃的测流记录以及实地观察,研究了紧靠火焰谷峡坝下游的格林河105公里段河床和河岸的调整。尽管此段以前曾被描述为缺乏沉积物,但这些数据表明,沉积物在所有河段中都在积聚,并且在有历史数据的任何位置,床层都没有退化。调整是通过坝后沉积物的沉积和坝前沉积物的稳定来进行的,从而使河道的平均宽度减少了10-30%。大坝后的所有表面都被木质的河岸植被所占据。通道调整的样式在地貌定义的范围之间变化。在由碎屑扇和砾石层限制的蜿蜒河段所主导的峡谷中,砾石条变得不活跃,并积聚了细小的沉积物。在沙床蜿蜒的河段中,现有岛屿的规模有所增加,并且形成了新的中河道岛屿。在所有这些类型的河段中,大坝后的沉积物都在河岸两旁,沉积物堆积在以前将岛屿与河岸分开的侧槽中。这些发现表明,显示出投入与产出之间平衡的沉积物预算不一定要解释为表明河床平衡。大坝与第一个长期应变计之间150 km的沉积物质量平衡表明大坝前后的投入和产出大致平衡。当考虑到预算组成的不确定性时,质量平衡是不确定的。尽管绿河在大坝前期可能已经处于近似平衡状态,但我们已经表明,在大坝后期河道宽度正在减小。大坝后的沉积物在第一支主要支流上游占沉积物预算的一小部分,但占很大比例。小型支流将泥沙供应到该河段,大坝前冲积物的侵蚀程度较小。在研究区的下游,坝后沉积物的体积相对于第一支主要支流输入的沉积物的体积很小。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号