...
首页> 外文期刊>Geomorphology >Sediment transport in a large impounded river: The lower Ebro, NE Iberian Peninsula
【24h】

Sediment transport in a large impounded river: The lower Ebro, NE Iberian Peninsula

机译:大型蓄水河中的泥沙输送:伊比利亚半岛东北部埃布罗河下游

获取原文
获取原文并翻译 | 示例
           

摘要

The sediment transport of the highly regulated lower Ebro River is estimated on the basis of a measuring programme carried out between 2002 and 2004. Total sediment transport, including both suspended load and bedload, was measured upstream and downstream from the Mequinenza and Riba-roja reservoirs, with special attention to the transport during floods. Annual total load upstream from the dams is estimated at around 1.64·10~6 t, of which at least 99% is transported in suspension. Annual total load downstream from the dams is estimated at around 0.45·10~6 t, of which 60% is transported in suspension and the remaining 40% as bedload (mean D_(50-bl) in the range of 32mm). Total load represents 3% of what was transported at the beginning of the 20th century in the delta plain. Sediment yield is three to four times lower below the dams, a fact that is caused by the trapping of sediment within the reservoirs (around 90% in the case of suspended sediment and 100% in the case of bedload). As a consequence, sediment that is transported downstream from the dams is all entrained from the riverbed and eroded from the banks. The sediment deficit causes a mean riverbed incision of 30 mm per year, as estimated from bedload measurements and by means of scour chains and painted pebbles located between the lowermost dam and the measuring section 28 km downstream. Since floods have been reduced on average by 25% but sediment supply from upstream has been reduced to almost nothing, the river channel of the lower Ebro River will continue exporting sediment both during floods ( > 2000 m~3/s, mostly bedload) and frequent high flows (1000 m~3/s to 2000 m~3/s), making the incision progressive unless restoration steps are taken.
机译:高度管制的埃布罗河下游的泥沙输送是根据2002年至2004年实施的一项测量计划估算的。在梅奎恩扎和里巴罗哈水库的上游和下游测量了包括悬浮负荷和基床负荷在内的全部泥沙输送。 ,尤其要注意洪水期间的运输。大坝上游的年总负荷估计为1.64·10〜6 t左右,其中至少99%是通过悬吊运输的。大坝下游的年总负荷估计约为0.45·10〜6 t,其中60%以悬浮方式运输,其余40%作为基床负荷(平均D_(50-bl)在32mm范围内)。总负荷占20世纪初三角洲地区运输量的3%。沉积物的产量比大坝以下低三到四倍,这是由于水库内的泥沙截留造成的(对于悬浮泥沙而言约为90%,对于床荷而言约为100%)。结果,从大坝向下游输送的沉积物全部从河床夹带并从河岸侵蚀。泥沙不足会导致每年平均河床切口30毫米,这是根据河床荷载测量以及通过位于最下游大坝和下游28 km的测量段之间的冲刷链和粉刷的鹅卵石估算得出的。由于洪水平均减少了25%,但上游的泥沙供应几乎减少了,因此埃布罗河下游的河道在洪灾期间(> 2000 m〜3 / s,主要是河床负荷)和洪水期间将继续输出泥沙。频繁的高流量(1000 m〜3 / s至2000 m〜3 / s),除非采取恢复步骤,否则切口会渐进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号