首页> 外文期刊>Geomorphology >Rapid assessment of gully sidewall erosion rates in data-poor catchments: A case study in Australia
【24h】

Rapid assessment of gully sidewall erosion rates in data-poor catchments: A case study in Australia

机译:快速评估数据贫乏地区的沟壁侵蚀速率:以澳大利亚为例

获取原文
获取原文并翻译 | 示例
           

摘要

Knowledge of erosion rates and sediment yields from gullies is critical for the effective prioritisation of management efforts aimed at reducing the impact of gully-derived sediments on water quality. This paper describes a rapid assessment method for estimating sidewall gully erosion rates for already established gully networks. It combines a conceptual-empirical model of the cycle of gully initiation and stabilisation with an easy-to-apply technique for assessing gully extent and dimensions. The method is illustrated using a case study of the Avon-Richardson Catchment of north-central Victoria, Australia. It is estimated that a total of 4.6 × 10~6 tonnes of sediment have been generated in that catchment from gully erosion since the latest major phase of gullying in the mid 1800s. This is equivalent to 8.9 tha~(-1) y~(-1) if sediment generation was evenly distributed spatially and temporally across the 3300 km~2 catchment over 160 years prior to 2010. Current rates of gully erosion are estimated to be 4700ty~(-1) (equivalent to 1.4 tha~(-1) y~(-1)). The results are comparable with observed rates of sidewall erosion in the Avon-Richardson Catchment. Further testing is required to build confidence in its applicability to assess sediment yields and for assisting regional authorities to plan remediation efforts.
机译:了解沟渠的侵蚀速率和沉积物产量对于有效地优先安排旨在减少源自沟壑的沉积物对水质的影响的管理工作至关重要。本文介绍了一种快速评估方法,用于估算已经建立的沟渠网络的侧壁沟壑侵蚀率。它结合了河谷形成和稳定周期的概念-经验模型,以及用于评估河谷范围和大小的易于应用的技术。该方法以澳大利亚维多利亚州中北部的Avon-Richardson集水区为例进行了说明。据估计,自1800年代中期最近一次沟壑主要阶段以来,由于沟壑侵蚀,该流域共产生了4.6×10〜6吨沉积物。如果在2010年之前的160年内,在3300 km〜2流域内沉积物的产生在空间和时间上均匀分布,则相当于8.9 tha〜(-1)y〜(-1)。目前的沟壑侵蚀率估计为4700ty 〜(-1)(相当于1.4 tha〜(-1)y〜(-1))。结果与在Avon-Richardson集水区中观察到的侧壁侵蚀速率相当。需要进一步测试以建立其对评估沉积物产量的适用性的信心,并协助区域当局计划补救措施。

著录项

  • 来源
    《Geomorphology》 |2010年第4期|p.330-338|共9页
  • 作者单位

    Department of Primary Industries, Future Farming Systems Research Division, Rutherglen Centre, RMB 1145 Chiltem Valley Road, Rutherglen, VIC 3685, Australia;

    rnIntegrated Catchment Assessment and Management Centre, The Fenner School of Environment and Society, the Australian National University, Canberra, ACT 0200, Australia;

    rnDepartment of Primary Industries, Future Farming Systems Research Division, Rutherglen Centre, RMB 1145 Chiltem Valley Road, Rutherglen, VIC 3685, Australia;

    rnTeagasc, Environment Research Centre, Johnstown Castle, Wexford, County Wexford, Ireland;

    rnDepartment of Primary Industries, Future Farming Systems Research Division, Rutherglen Centre, RMB 1145 Chiltem Valley Road, Rutherglen, VIC 3685, Australia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    gully erosion model; sediment generation; rapid assessment; erosion rates;

    机译:沟壑侵蚀模型;沉积物产生快速评估;侵蚀率;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号