Dilatation characteristics of the coals with outburst proneness under cyclic loading conditions and the relevant applications

机译:周期性载荷条件下突出倾向性煤的膨胀特性及其应用

获取原文
获取原文并翻译 | 示例
       

摘要

By conducting uniaxial loading cycle tests on the coal rock with outburst proneness, the dilatation characteristics at different loading rates were investigated. Under uniaxial loading and unloading, the lateral deformation of coal rock increased obviously before failure, leading to coal dilatation. Moreover, the post-unloading recovery of the lateral deformation was rather small, suggesting the onset of an accelerated failure. As the loading rate increased further, the ratio of the stress at the dilatation critical point to peak-intensity increased gradually, and the pre-peak volumetric deformation decreased with more severe post-peak damage. Based on the laboratory test results, the lateral deformation of the coals at different depths in the #1302 isolated coal pillars, Yangcheng Coal Mine, was monitored using wall rock displacement meter. The field monitoring result indicates that the coal lateral displacement went through various distinct stages: the lateral displacement of the coals at the depth of 2-6 m went through an "initial increase-stabilize-step up-plateau" series. When the coal wall of the working face was 24-18 m away from the measuring point, the coals in this region entered the accelerated failure stage; as the working face continued advancing, the lateral displacement of the coals at the depth over 6 m increased steadily, i.e., the coals in this region were in the stable failure stage.
机译:通过对突出倾向性煤岩进行单轴加载循环试验,研究了不同加载速率下的膨胀特性。在单轴加载和卸载下,煤岩的侧向变形在破坏前明显增加,导致煤的膨胀。此外,横向变形的卸载后恢复相当小,表明加速破坏的开始。随着加载速率的进一步增加,膨胀临界点处的应力与峰值强度的比值逐渐增加,并且峰前体积变形减小,峰后损伤更严重。根据实验室测试结果,使用围岩位移计监测#1302隔离煤柱羊城煤矿不同深度煤的横向变形。现场监测结果表明,煤的横向位移经历了不同的阶段:2〜6 m深度的煤的横向位移经历了“初始增稳阶跃上升高原”系列。当工作面煤壁距离测量点24〜18 m时,该区域的煤进入加速破坏阶段。随着工作面的不断推进,6m以上深度煤的侧向位移稳定增加,即该区域的煤处于稳定破坏阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号